Borehole Drilling

Borehole Drilling

The bore hole drilling operation is effected in stages

Project Stages:

Stage I: Geological survey. The initial step is to undertaken a geological survey to determine the depth of the aquifer, good drinkable water and long lasting one. This is the feasibility work which will reveal and rock basement which will enable us achieve a perfect work. 

Stage II: We drill between 35-100 meters depending on the geological survey report showing the water level and basement rock. The basement rock does not pose much challenge as we have the needed equipment to ensure success of the exercise. Stage Drilling, casting, development and installation. Etc.